
How it works
Site Survey & Feasibility Study
Assessment of rooftop catchment area, rainfall runoff potential, soil condition, and feasibility for rainwater harvesting within the society premises.
Documentation & Design
Preparation of rainwater harvesting design drawings, system layout, and documentation required for approvals and implementation.
Liaisoning & Approvals
Coordination with relevant authorities such as BMC or CGWB for necessary permissions and compliance requirements.
Collection & Conveyance Setup
Installation of rooftop rainwater collection systems including gutters, downpipes, and conveyance pipelines directing rainwater to filtration units.
Filtration & First Flush System
Installation of filtration units and first flush systems to remove debris, dust, and contaminants before recharge or storage.
Recharge Pit / Storage Integration
Construction of recharge pits or integration with storage tanks for groundwater recharge or non-potable water use.
Testing & Commissioning
System testing to verify proper water flow, filtration efficiency, and operational performance.
RWH System Setup (Without Borewell)
1. Site Survey & Feasibility Study 2. Documentation & Design 3. Liaisoning & Approvals 4. Collection & Conveyance Setup 5. Filtration & First Flush System 6. Recharge Pit / Storage Integration 7. Testing & Commissioning
1. Site Survey & Feasibility Study 2. Documentation & Design 3. Liaisoning & Approvals 4. Collection & Conveyance Setup 5. Filtration & First Flush System 6. Recharge Pit / Storage Integration 7. Testing & Commissioning
Best in class service
Background
Verified
On
time job delivery
Reliable
& Secure
Expert
Service Professionals
How it works
Site Survey & Feasibility Study
Assessment of rooftop catchment area, rainfall runoff potential, soil condition, and feasibility for rainwater harvesting within the society premises.
Documentation & Design
Preparation of rainwater harvesting design drawings, system layout, and documentation required for approvals and implementation.
Liaisoning & Approvals
Coordination with relevant authorities such as BMC or CGWB for necessary permissions and compliance requirements.
Collection & Conveyance Setup
Installation of rooftop rainwater collection systems including gutters, downpipes, and conveyance pipelines directing rainwater to filtration units.
Filtration & First Flush System
Installation of filtration units and first flush systems to remove debris, dust, and contaminants before recharge or storage.
Recharge Pit / Storage Integration
Construction of recharge pits or integration with storage tanks for groundwater recharge or non-potable water use.
Testing & Commissioning
System testing to verify proper water flow, filtration efficiency, and operational performance.